Home / 2008 Beijing Olympic Games / News Tools: Save | Print | E-mail | Most Read | Comment
Facts and figures about the opening ceremony
Adjust font size:

The 29th summer Olympic Games opened in Beijing on Friday night. The following are some facts and figures about the opening ceremony.

The venue

The opening was held in the National Stadium, also known as the Bird's Nest, in the Olympic Green in northern Beijing.

The stadium was jointly designed by Herzog & de Meuron Design Office, and China Architecture Design & Research Group and ARUP. Its construction began on Dec. 24, 2003, and completed on June 30, 2008. Altogether 45,000 tonnes of steel was used to build its framework.

The stadium's seating capacity is 91,000, including 11,000 temporary seats. The floor space is 258,000 square meters.

Ground facilities

A major elevating platform at the center is 20 meters in diameter, weighing about 400 tonnes, and can reach 11.4 meters high at a speed of zero to 12 meters per minute.

Two moving lids on the stage serve as a roof.

A 36 by 22 meters LED screen is installed on the plates.

On the south and north sides are 30 complementary platforms, with each 3-meter-wide and 3-meter-long.

When the two lids move toward the center, the complementary platforms will rise and make up the stage.

Two sets of 22-meter-long LED scroll painting were installed, with a diameter of 22 meters.

With LED images shown on it, the scroll painting can stretch 147 meters long.

Above-stage facilities

Ten steel ropes are hung above the stage, weighing 40 tonnes in all and with a total length of 55 kilometers.

Among the 31 wire devices, 16 sets can carry a load of 300 kilograms each, with a load of 100 kilograms for each of the other 15. All can move at 3 meters per second and can function at the same time.

One hundred jumping facilities with a load capacity of 80 kilograms each are set under the rim of the roof edge, which can move at 3 meters per second and be operated simultaneously.

LED screen on the ground

A 147 by 22 meters LED screen is laid at the center. Approximately 44,000 colorful LED beads are embedded with a distance of 600 millimeters between each two.

Fireworks celebration

-- 287 points on the top of National Stadium

-- 27 positions in the central area of National Stadium

-- 12 positions in the Olympic Green

-- 29 positions on the axis of the city

-- 4 places in other urban areas

Music

A total of 110 minutes of music was created by 18 composers for the opening ceremony.

Lighting

Altogether 2,583 special lights are used and lighting equipment weighing more than 300 tonnes has been installed. Electricity load for lighting totals 6,440 kilowatt.

Costumes

A total of 15,153 sets of costumes in 47 styles.

Rehearsal

Some performances have been rehearsed for 13 months. Volunteers began their first mass rehearsal in March 2008.

(Xinhua News Agency August 8, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Olympics opening ceremony to celebrate sport, Chinese culture
- Audence enters the National Stadium for the Olympic opening ceremony
- Folk ballads, dances prelude Olympics opening ceremony
- Olympic opening ceremony is coming!
- Olympic opening ceremony is coming!
Most Viewed >>
- Chinese women's gymnastics team practises for Olympics
- Countdown to Olympic opening ceremony
- Schedule
- A visual tour to Shanghai Olympic Hotel
- Big names, honorable flag bearers

Product Directory
China Search
Country Search
Hot Buys
主站蜘蛛池模板: 免费观看激色视频网站(性色) | 成人中文乱幕日产无线码| 亚洲av一本岛在线播放| 欧美理论在线观看| 人禽伦免费交视频播放| 精品国产日韩亚洲一区91| 国产一区二区三区夜色| 露脸国产自产拍在线观看| 国产成人精品高清在线观看99| 2021麻豆剧果冻传媒影视| 在打烊后仅剩两人接档泡面番| xxxxx做受大片在线观看免费| 成人国产mv免费视频| 四虎影视884aa·com| 韩国三级hd中文字幕| 国产无遮挡AAA片爽爽| h小视频在线观看| 国产精品无码无在线观看| 99RE6在线视频精品免费| 太大了阿受不了好爽小说| 久久只有这才是精品99| 最近免费中文字幕大全| 亚洲天堂电影在线观看| 欧美色欧美亚洲高清在线视频 | 亚洲男人天堂2022| 顶级欧美熟妇xx| 国产无套在线播放| 中文字幕日韩丝袜一区| 女博士梦莹凌晨欢爱| 一级毛片视频在线| 日韩三级小视频| 久久青青草原亚洲av无码麻豆| 欧洲成人r片在线观看| 亚洲午夜电影网| 欧美午夜理伦三级在线观看| 亚洲国产韩国一区二区| 欧美日韩免费在线观看| 亚洲欧美一区二区三区| 欧美牲交a欧美牲交aⅴ久久| 亚洲熟妇av一区二区三区宅男| 激情综合色五月六月婷婷|