Home / 2008 Beijing Olympic Games Tools: Save | Print | E-mail | Most Read | Comment
Facts and figures about the opening ceremony
Adjust font size:

The 29th summer Olympic Games opened in Beijing on Friday night. The following are some facts and figures about the opening ceremony.

The venue

The opening was held in the National Stadium, also known as the Bird's Nest, in the Olympic Green in northern Beijing.

The stadium was jointly designed by Herzog & de Meuron Design Office, and China Architecture Design & Research Group and ARUP. Its construction began on Dec. 24, 2003, and completed on June 30, 2008. Altogether 45,000 tonnes of steel was used to build its framework.

The stadium's seating capacity is 91,000, including 11,000 temporary seats. The floor space is 258,000 square meters.

Ground facilities

A major elevating platform at the center is 20 meters in diameter, weighing about 400 tonnes, and can reach 11.4 meters high at a speed of zero to 12 meters per minute.

Two moving lids on the stage serve as a roof.

A 36 by 22 meters LED screen is installed on the plates.

On the south and north sides are 30 complementary platforms, with each 3-meter-wide and 3-meter-long.

When the two lids move toward the center, the complementary platforms will rise and make up the stage.

Two sets of 22-meter-long LED scroll painting were installed, with a diameter of 22 meters.

With LED images shown on it, the scroll painting can stretch 147 meters long.

Above-stage facilities

Ten steel ropes are hung above the stage, weighing 40 tonnes in all and with a total length of 55 kilometers.

Among the 31 wire devices, 16 sets can carry a load of 300 kilograms each, with a load of 100 kilograms for each of the other 15. All can move at 3 meters per second and can function at the same time.

One hundred jumping facilities with a load capacity of 80 kilograms each are set under the rim of the roof edge, which can move at 3 meters per second and be operated simultaneously.

LED screen on the ground

A 147 by 22 meters LED screen is laid at the center. Approximately 44,000 colorful LED beads are embedded with a distance of 600 millimeters between each two.

Fireworks celebration

-- 287 points on the top of National Stadium

-- 27 positions in the central area of National Stadium

-- 12 positions in the Olympic Green

-- 29 positions on the axis of the city

-- 4 places in other urban areas

Music

A total of 110 minutes of music was created by 18 composers for the opening ceremony.

Lighting

Altogether 2,583 special lights are used and lighting equipment weighing more than 300 tonnes has been installed. Electricity load for lighting totals 6,440 kilowatt.

Costumes

A total of 15,153 sets of costumes in 47 styles.

Rehearsal

Some performances have been rehearsed for 13 months. Volunteers began their first mass rehearsal in March 2008.

(Xinhua News Agency August 8, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Olympics opening ceremony to celebrate sport, Chinese culture
- Audience enters the National Stadium for the Olympic opening ceremony
- Folk ballads, dances prelude Olympics opening ceremony
- Olympic opening ceremony is coming!
- Olympic opening ceremony is coming!
Most Viewed >>
- Medal Tally
- Schedule
- China's duo make beach volleyball top 16
- Top leaders cheer for athletes at opening ceremony
- China loses to Spain 85-75 in men's basketball

Product Directory
China Search
Country Search
Hot Buys
主站蜘蛛池模板: 国精品无码一区二区三区在线| 日日摸日日碰夜夜爽亚洲| 人人玩人人添人人| 美国大片免费收看| 国产在线98福利播放视频免费| 亚洲国产av一区二区三区丶| 男人j进女人p免费视频播放| 卡一卡2卡3卡精品网站| 超碰97人人做人人爱少妇| 国产日韩精品一区二区三区在线| 91区国产福利在线观看午夜| 天天操天天干天天爽| 一本色道久久99一综合| 日产2021乱码一区| 久久波多野结衣| 最近最新中文字幕完整版免费高清| 亚洲欧洲成人精品香蕉网| 狠狠色丁香九九婷婷综合五月| 免费看美女隐私全部| 精彩视频一区二区| 国产不卡视频在线| 青青青国产免费线在| 国产婷婷综合在线视频| 国产老妇一性一交一乱| 国产精品99久久久久久宅男| 18一20岁一级毛片| 国产黄a三级三级看三级| ass亚洲**毛茸茸pics| 女人被免费视频网站| 一个人看的视频www在线| 性欧美video在线播放| 中文字幕在线网址| 新婚熄与翁公试婚小说| 久久99精品久久久久久不卡| 日本在线高清视频 | 亚洲国产欧美一区二区欧美| 欧美精品黑人粗大| 亚洲精品中文字幕乱码| 波多野结衣与老人公569| 亚洲精品欧美日韩| 波多野结衣在线一区二区|