Home / 2008 Beijing Olympic Games Tools: Save | Print | E-mail | Most Read | Comment
Facts and figures about the opening ceremony
Adjust font size:

The 29th summer Olympic Games opened in Beijing on Friday night. The following are some facts and figures about the opening ceremony.

The venue

The opening was held in the National Stadium, also known as the Bird's Nest, in the Olympic Green in northern Beijing.

The stadium was jointly designed by Herzog & de Meuron Design Office, and China Architecture Design & Research Group and ARUP. Its construction began on Dec. 24, 2003, and completed on June 30, 2008. Altogether 45,000 tonnes of steel was used to build its framework.

The stadium's seating capacity is 91,000, including 11,000 temporary seats. The floor space is 258,000 square meters.

Ground facilities

A major elevating platform at the center is 20 meters in diameter, weighing about 400 tonnes, and can reach 11.4 meters high at a speed of zero to 12 meters per minute.

Two moving lids on the stage serve as a roof.

A 36 by 22 meters LED screen is installed on the plates.

On the south and north sides are 30 complementary platforms, with each 3-meter-wide and 3-meter-long.

When the two lids move toward the center, the complementary platforms will rise and make up the stage.

Two sets of 22-meter-long LED scroll painting were installed, with a diameter of 22 meters.

With LED images shown on it, the scroll painting can stretch 147 meters long.

Above-stage facilities

Ten steel ropes are hung above the stage, weighing 40 tonnes in all and with a total length of 55 kilometers.

Among the 31 wire devices, 16 sets can carry a load of 300 kilograms each, with a load of 100 kilograms for each of the other 15. All can move at 3 meters per second and can function at the same time.

One hundred jumping facilities with a load capacity of 80 kilograms each are set under the rim of the roof edge, which can move at 3 meters per second and be operated simultaneously.

LED screen on the ground

A 147 by 22 meters LED screen is laid at the center. Approximately 44,000 colorful LED beads are embedded with a distance of 600 millimeters between each two.

Fireworks celebration

-- 287 points on the top of National Stadium

-- 27 positions in the central area of National Stadium

-- 12 positions in the Olympic Green

-- 29 positions on the axis of the city

-- 4 places in other urban areas

Music

A total of 110 minutes of music was created by 18 composers for the opening ceremony.

Lighting

Altogether 2,583 special lights are used and lighting equipment weighing more than 300 tonnes has been installed. Electricity load for lighting totals 6,440 kilowatt.

Costumes

A total of 15,153 sets of costumes in 47 styles.

Rehearsal

Some performances have been rehearsed for 13 months. Volunteers began their first mass rehearsal in March 2008.

(Xinhua News Agency August 8, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Olympics opening ceremony to celebrate sport, Chinese culture
- Audience enters the National Stadium for the Olympic opening ceremony
- Folk ballads, dances prelude Olympics opening ceremony
- Olympic opening ceremony is coming!
- Olympic opening ceremony is coming!
Most Viewed >>
- Medal Tally
- Schedule
- China's duo make beach volleyball top 16
- Top leaders cheer for athletes at opening ceremony
- China loses to Spain 85-75 in men's basketball

Product Directory
China Search
Country Search
Hot Buys
主站蜘蛛池模板: flstingextreme头交| 久久精品久久久久观看99水蜜桃| a色毛片免费视频| 极品丝袜乱系列在线阅读| 亚洲精品欧美日本中文字幕| 靠逼软件app| 国产福利萌白酱喷水视频铁牛| 一级中文字幕乱码免费| 李宗瑞60集k8经典网| 免费播放美女一级毛片| 国产成人精品亚洲2020| 国产精品永久免费| 99国产精品99久久久久久| 好日子在线观看视频大全免费| 久久综合九色欧美综合狠狠| 狠狠色婷婷久久一区二区| 国产亚洲精品自在久久| 九九影院理论片在线观看一级 | 免费网站看v片在线a| 美腿丝袜亚洲综合| 国产不卡视频在线| 两个人看的www免费视频中文| 成人免费视频88| 久久综合狠狠综合久久综合88| 欧美孕妇乱大交xxxx| 亚洲欧美丝袜制服在线| 波多野结衣忆青春| 亚洲视频你懂的| 特级aaaaaaaaa毛片免费视频| 免费a级毛片出奶水| 色噜噜视频影院| 国产熟女高潮视频| 两个人看的www免费视频| 国产精品无码免费视频二三区| 777亚洲精品乱码久久久久久| 国内精品久久久久久99蜜桃| 中文字幕乱码第一页| 日日天干夜夜人人添| 亚洲一区中文字幕在线观看| 欧美国产精品va在线观看| 亚洲图片第一页|