China Yangtze Three Gorges Project (TGP), as one of the biggest hydropower-complex project in the world, ranks as the key project for improvement and development of Yangtze River. The dam is located in the areas of Xilingxia gorge, one of the three gorges of the river, which will control a drainage area of 1 million square km, with an average annual runoff of 451 billion cubic meters. The open valley at the dam site, with hard and complete granite as the bedrock, has provided the favorable topographical and geological conditions for dam construction.

TGP is a multi-objective development project with great benefits in flood control, power generation, and navigation and so on. The project consists of river dam, spillway structures, powerhouse, buildings for navigation, etc, and organized by the scheme officially briefed as "developed in one scale, completed in one time, water-storage by stages, and continuous migration". The dam is concrete gravity dam, with the spillway in the middle, and the power house and non-overflow section at both sides. The axial length of the dam is 2309.47 m, the crest height is 185m, and the maximum height of the dam is 181m. With a normal storage level at 175m, the total capacity of the reservoir reaches 39.3 billion cubic meters, of which the effective flood control capacity reaches 22.15 billion cubic meters.

The total period of TGP construction is 17 years, which can be divided into three phases. Phase I (1993~1997) was designed mainly to do advance work for project construction and excavation of diversion channel with the river close-off as the milestone. Phase II (1998-2003) was mainly designed for construction of spillway and left-bank power house and the ship lock, with the completion of initial water storage, commercial operation of first batch of generators and ship lock open to navigation as several significant milestones of this phase. Phase III (2004-2009) has the main task of construction of right-bank dam and powerhouse, which is symbolized as the commercial operation of all the generator units and completion of the project.

The official approved static budget for preliminary design of TGP (based on the price at the end of May 1993 without considering the factors of price rises and loan interest in the construction period) is RMB 90.09 billion yuan, of which RMB 50.09 billion yuan is for the project construction, and the other RMB 40 billion yuan for the reservoir and migrants resettlement. Once the price rises and loan interests occurred in the long construction period and other such factors are considered, the dynamic budget will reach RMB 203.9 billion yuan.

The funds for the project comes from several sources such as state investment named Three Gorges Fund, power generation income of Gezhouba and Three Gorges power plant, loans from the state development bank and commercial banks, issuance of bonds and stocks, export credit and so on. The funds is well in place in the construction period.

By the end of August 2004, a total of RMB 111.6 billion the fulfilled total has been investment invested since the project started is RMB 106.653 billion yuan, and the static investment is RMB 72 73.2 billion yuan, of which 38.95 40.4 billion yuan for the project and 3 3.05 2.8 billion yuan for the reservoir and compensation to reservoir impoundment migrants. Considering for the match between the amount of works and the investment, the percentage in completed physical work quantity is larger than that of the investment, which indicates that the budge is well under s control operates well control. Based on the current conditions, it's expected to keep the total investment below an be managed below RMB 180 billion yuan when at the project is completed.

For over ten years as the legal person responsible for the project, China Yangtze Three Gorges Development Corporation (CTGPC) persists on organizing the project construction according to market economic principles, and executes a project construction management system with legal person responsibility as the core, including bidding for contractors, management by contracts, constructing with supervision. In the project construction, the quality is put at the first place, and management creation is emphasized. In order to improve the quality management level, a QA system is established with multi-level control and whole-process supervision. And considering TGP's features of large scale and great number of components, the progress control system is established based on the project management principles and with computer information system as supplementary. And the so called "static control and dynamic management" budget system and the contracts based investment control system are set up, which forms double restricts for the investment. With all these methods, the factual construction progress satisfies the complete arrangement of the project, and project quality conforms with the design, and investment is controlled within the budget approved by the state.

(China.rog.cn, China Daily, September 28, 2007)

Tools: Save | Print | E-mail | Most Read Bookmark and Share
Comment
Pet Name
Anonymous

China Archives
Related >>
NGO Events Calendar Tips
- The Eco Design Fair 2009
- Environmental English Training (EET) class
- Hand in hand to protect endangered animals and plants
- Changchun, Mini-marathon Aimed at Protecting Siberian Tiger
- Water Walk by Nature University
More
Archives
World Fights A/H1N1 flu
The pandemic fear grips the world as the virus spreads from Mexico to the US, Europe and as far as China.
Panda Facts
A record 28 panda cubs born via artificial insemination have survived in 2006.
South China Karst
Rich and unique karst landforms located in south China display exceptional natural beauty.
Saving the Tibetan Antelopes
The rare animals survive in the harsh natural environment of the Qinghai-Tibet Plateau.
More
Laws & Regulations
- Forestry Law of the People's Republic of China
- Meteorology Law of the People's Republic of China
- Fire Control Law of the People's Republic of China
- Law on Protecting Against and Mitigating Earthquake Disasters
- Law of the People's Republic of China on Conserving Energy
More
Links:
State Environmental Protection Administration
Ministry of Water Resources
Ministry of Land and Resources
China Environmental Industry Network
Chengdu Giant Panda Research Base
主站蜘蛛池模板: 强行入侵粗暴h肉囚禁| 极品少妇被啪到呻吟喷水| 啊!摁摁~啊!用力~快点视频免费| 国产精品俺来也在线观看| 国产精品无码免费专区午夜| [中文][3d全彩]舞房之夜| 悠悠在线观看精品视频| 久久久一本精品99久久精品88| 最新版资源在线天堂| 亚洲女初尝黑人巨高清| 清早可以吃西瓜吗| 免费成人在线电影| 美女羞羞免费视频网站| 无码中文av有码中文a | 亚洲精品伊人久久久久| 里番全彩acg★无翼娜美| 性色av一区二区三区| 久久久久夜夜夜精品国产| 晚上差差差软件下载| 亚洲一成人毛片| 欧美在线视频网| 免费特黄一区二区三区视频一 | 奶交性视频欧美| 久久婷婷五月综合色精品| 热re99久久精品国产99热| 免费无码成人AV在线播放不卡| 精品视频在线观看一区二区三区 | 欧美国产日本高清不卡| 免费永久国产在线视频| 美女破处在线观看| 国亚洲欧美日韩精品| 色综合天天色综合| 国产中文字幕免费| 跳蛋在里面震动嗯哼~啊哈...| 国产在线观看91精品不卡| 99久久无色码中文字幕人妻蜜柚 | 亚洲综合久久1区2区3区| 特级毛片爽www免费版| 人妻少妇精品视频专区| 被男按摩师添的好爽在线直播| 国产在线观看麻豆91精品免费|