--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service


Hot Links
China Development Gateway
Chinese Embassies

The Ministry of Foreign Affairs
The Ministry of Foreign Trade and Economic Cooperation
Permanent Mission of the People's Republic of China to the UN
Permanent Mission of the People's Republic of China to the United Nations Office at Geneva and other International Organizations in Switzerland
Foreign Affairs College
Institute of American Studies Chinese Academy of Social Sciences
Russia Delays Launching Nuclear Power Plant in Iran

Russia has decided to put off for one year the launch of the Bushehr nuclear power plant which it helps Iran to build, an official with the Russian Ministry of Atomic Energy said Monday.

The first generating unit in the plant will be put into operation in 2005 instead of the original year of 2004, and connecting the reactor to the power system will be correspondingly postponed from 2005 to 2006, according to a new work schedule made by the Russian-Iranian Coordination Commission, Itar-Tass news agency quoted the official as saying.

Russia and Iran will soon determine the final date for the start-up of the reactor, said the official.

He explained that the decision was made due to the fact that 15 percent of the equipment, which is necessary for the completion of the project, was not delivered in time to the construction site of the power plant, and the Iranian side had to buy the equipment in third countries.

Russia has been insisting that it would not deliver nuclear fuel to the plant until Iran signs a deal promising to return spent fuel to Russia.

The official confirmed Monday that "the undetermined deadline for signing the protocol on the return of spent fuel from Bushehr to Russia, where it is to be stored up and reprocessed, was in no way responsible for the postponement of the date of commissioning."

The official stressed that Iran is ready to sign the document and negotiations on the issue are underway between the two sides.

Iran, suspected of using the plant to develop nuclear weapons, is facing an Oct. 31 deadline set by the International Atomic Energy Agency (IAEA) to clarify its nuclear programs since traces of enriched uranium were found in some Iranian nuclear facilities.

Russia hinted last month that it could stop building the first reactor of the Bushehr plant if the United Nations Security Council passes a resolution imposing sanction against Tehran.

Russia sticks to its cooperation with Iran in the 800-million-dollar plant despite the call from the United States to freeze the project, reiterating that the project is carried out in accordance with all rules and requirements of the IAEA and in the field of peaceful use of the technology for generating electric power.

(Xinhua News Agency October 14, 2003) 

Iran, DPRK Urged to End Nuclear Programs
US Sanctions Russian Firm for Selling Arms to Iran
Russia to Deliver Nuclear Fuel to Iran soon
Russian FM, Iranian Vice President Meet on Nuclear Cooperation
Russia to Continue Nuke Power Plant Construction in Iran
Russia to Go Ahead with Iran Nuclear Reactor
Iran, Russia Secure Nuke Cooperation
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 亚洲一级毛片免费看| 十七岁日本高清电影免费完整版| 8x网站免费入口在线观看| 寂寞山村恋瘦子的床全在线阅读| 久久久久人妻一区精品果冻| 最新国产精品精品视频| 亚洲成av人片高潮喷水| 狠狠色丁香婷婷| 免费观看a黄一级视频| 老师的兔子好多软水在线看| 国产又黄又爽又刺激的免费网址| ww亚洲ww在线观看国产| 国产黄色片在线观看| bl道具play珠串震珠强迫| 少妇愉情理伦片高潮日本 | 国产精品国色综合久久| 99久久精品免费看国产一区二区三区| 少妇大胆瓣开下部自慰| 中文在线观看永久免费| 日产精品久久久久久久性色| 久久国产乱子伦精品在| 日韩欧美色视频在线观看| 亚洲avav天堂av在线网爱情| 欧美激情xxx| 亚洲第一页综合图片自拍| 狠狠97人人婷婷五月| 免费一级毛片在级播放| 精品久久久无码人妻中文字幕| 四虎AV永久在线精品免费观看| 色综合天天综合网国产成人| 国产偷v国产偷v亚洲高清| 香蕉视频免费看| 国产在线视频网| 黄色三级三级免费看| 国产成人精品三级麻豆| 国内精品免费麻豆网站91麻豆| 国产真实偷乱小说| 四虎在线视频免费观看视频| 国产精品国三级国产AV| 看黄色免费网站| 国产福利第一页|