Tools: Save | Print | E-mail | Most Read
Qinghai-Tibet Railway on the Right Track
Adjust font size:

Four plans were initially proposed when China decided to build a railway to Tibet. They were lines from west China's Qinghai Province, northwest Gansu Province and southwest Sichuan and Yunnan provinces. And why was the Qinghai-Tibet Railway finally given the thumbs up by the State Council on February 8, 2001?

 

Li Jincheng, chief designer of construction on the Qinghai-Tibet line says the route is superior to the others.  

 

Firstly, the Qinghai-Tibet link is the shortest. Compared with the 1,960-kilometer-long Yunnan-Tibet line, the 2,211-kilometer-long Gansu-Tibet link or the 2,015-kilometer-long Sichuan-Tibet route, the Qinghai-Tibet line from Golmud to Lhasa is the shortest at 1,110 kilometers.  

 

Additionally, the first 845 kilometers of the railway in Qinghai Province had been completed early in 1979. The completion and operation of this section provided valuable experience of construction for extending the line.  

 

And the costs of the Qinghai-Tibet link are less than the other options.

 

According to the general price index in 1995, the cost of the Qinghai-Tibet Railway was calculated at less than 20 billion yuan. The price of a Yunnan-Tibet railway was 65.4 billion yuan. The Gansu-Tibet railway was priced at 64 billion yuan and Sichuan-Tibet route was estimated at 76.8 billion yuan.

 

With the connection of the Qinghai-Tibet link, it is 3,952 kilometers from Lhasa to Beijing and 4,326 kilometers from Lhasa to Shanghai. It's therefore the most convenient line linking Tibet with inland cities and coastal areas.

 

Another factor is that preparatory work had been undertaken for the Qinghai-Tibet Railway since late 1950s.

 

With sound geological conditions the actual construction work along this particular route is less than what would be involved with the others. And experts have mastered how to deal with frozen ground conditions for railway construction projects at altitude.  

 

The terrain covered by the railway is relatively flat and in parts runs alongside the Qinghai-Tibet Road. This meant heavy machinery could be moved around and operated easily.

 

And the time required to construct the Qinghai-Tibet link is the shortest. Experts predicted that the Qinghai-Tibet Railway required six years to be built. However, it was estimated that the Gansu-Tibet and Yunnan-Tibet routes would have taken 32 years to finish and the Sichuan-Tibet line 38 years.

 

Various geographical difficulties such as landslides and mud-rock flows often occur on the other three options and will seldom happen on the Qinghai-Tibet Railway. Trains will be able to run all year round.

 

(China.org.cn June 25, 2006)

 

Tools: Save | Print | E-mail | Most Read

Related Stories

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 日韩精品欧美激情国产一区| 男女一进一出抽搐免费视频| 国产精品免费在线播放| www亚洲精品| 攵女yin乱合集高h文| 久久精品人人做人人爽电影蜜月| 欧美成人三级一区二区在线观看| 亚洲黄色在线看| 粗大黑人巨精大战欧美成人| 国产91精品一区二区麻豆亚洲| 高清中国一级毛片免费| 国产熟睡乱子伦视频| 182tv在线观看国产路线一| 在线免费观看a级片| gogo全球高清大胆啪啪| 已婚同事11p| 中文字幕人妻三级中文无码视频| 日韩内射美女片在线观看网站| 亚洲中文字幕av在天堂| 欧美日本韩国一区二区| 亚洲精品美女久久久久99| 狠狠躁夜夜躁人人爽天天天天97| 免费观看欧美一级牲片一| 精品视频一区二区三区在线播放| 国产中文字幕第一页| 高清色本在线www| 国产成人麻豆亚洲综合无码精品| jizzjizz成熟丰满舒服| 国产精品入口免费麻豆| 538精品在线观看| 国产超清在线观看| 99re热在线观看| 在线观看黄网站| JIZZJIZZ亚洲日本少妇| 天美一二三传媒免费观看| youjizz护士| 好吊色青青青国产在线观看 | 久久96国产精品久久久| 日本19禁啪啪无遮挡大尺度| 久久久久久国产精品mv| 无翼乌工口肉肉无遮挡无码18 |