--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies


Coal-fired Power Stations Banned

China has banned the building and expansion of many coal-fired power plants in big and medium-sized cities. 

The State Environmental Protection Administration (SEPA) released details of the ban, designed to control sulphur dioxide emissions, yesterday.

 

Nearly one-third of the country now suffers from serious acid rain, a major byproduct of sulphur dioxide emissions.

 

SEPA statistics show coal-fired power stations emitted more than 6.6 million tons of sulphur dioxide last year or more than a third of total emissions.

 

In big and medium-sized cities, thermo electricity projects that are approved under national energy policies and meet environmental protection standards can be given the green light.

 

But equipment to reduce sulphur dioxide emissions must be designed, built and operated as part of these projects, under the new measures.

 

This equipment must be included in new coal-fired power stations and existing plants due for expansion in "control" regions.

 

These regions, which extend for nearly 1.1 million square kilometers in China, are those with serious sulphur dioxide discharge and acid rain problems.

 

The regions include Beijing, Shanghai and 21 provincial capitals. Most are economically-advanced cities. They collectively account for more than 60 percent of the country's total sulphur dioxide emissions.

 

Since 1995, when China first mapped its sulphur dioxide hotspots, it has focused on controlling the emissions and reducing acid rain in these areas.

 

Outside the control areas, in western China, coal-fired power plants that fail to meet national discharge standards must also build "desulphurization" facilities.

 

Those that meet national standards will be asked to leave space for such facilities or to build them over time.

 

The new measures require local governments to establish sulphur dioxide control projects if they want to build coal-fired power plants. Such projects must form part of the plants.

 

Desulphurization projects in 137 coal-fired power plants, listed as "key plants," must be completed by 2005.

 

Any local governments or business that fails to meet the deadline will face severe penalties and be deprived of the opportunity to build or expand thermoelectricity projects.

 

The measures also push for coal-fired plants to be charged for the sulphur dioxide they emit.

 

(China Daily October 9, 2003)

Reining in Acid Rain in Guangdong Province
Emission Trading to Curb Acid Rain
Emissions Plan Set to Expand
China Unveils Plan to Curb Sulfur Dioxide, Acid Rain
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 久久久久久AV无码免费网站下载| 亚洲高清免费在线观看| 久久人人做人人玩人精品| 在线精品国产一区二区三区| 中文字幕AV一区中文字幕天堂| 日韩系列第一页| 亚洲人成伊人成综合网久久久| 污污视频在线免费观看| 免费精品国产自产拍观看| 色视频线观看在线播放| 国产手机在线αⅴ片无码观看| 3d无尽3d无尽动漫同人| 在线观看国产小屁孩cao大人| 一级**爱片免费视频| 拍拍拍无档又黄又爽视频| 久久亚洲精品人成综合网| 最近中文字幕高清字幕在线视频| 亚洲国产最大av| 欧美色图另类图片| 亚洲高清中文字幕综合网| 精品久久无码中文字幕| 四虎免费久久影院| 色欲久久久天天天综合网精品| 国产国产人免费人成免费视频| 国产4tube在线播放| 国产激情视频在线播放| 娇喘午夜啪啪五分钟娇喘| 国产精品青青青高清在线| 99久久99久久久99精品齐| 天堂中文资源网| gogogo高清在线播放| 小泽玛利亚番号| 一级特黄aaa大片在| 成人福利视频app| 中文字幕无线码一区二区| 日本dhxxxxxdh14日本| 国产乱码精品一区二区三| 黑人粗大猛烈进出高潮视频 | 国产免费午夜a无码v视频| 成人黄色免费网站| 国产成人精品免费视频大全|