--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

West-east Gas Pipeline to Be in Operation

A 3,900-kilometer-long natural gas pipeline that spans across the breadth of the country is scheduled for completion and commercial operation by the end of this year, according to Vice-Minister Zhang Guobao of the State Development and Reform Commission in Beijing Monday.

The mammoth project, which starts in the Tarim basin of the Xinjiang Uygur Autonomous Region in northwest China and ends in the east China coastal city of Shanghai, is part of the efforts of the country to make full utilization of the rich resources in the western part of the country and ease energy-hunger in the economically developed eastern part.

The eastern part of the pipeline, which refers to the 1,500 kilometers from Jingbian in northern Shaanxi to Shanghai, was completed by the end of last year and has begun to supply natural gas to Shanghai from January 1, 2004, Zhang told a press conference as sidelines of the annual session of China's top legislature.

During the icy cold winter, Shanghai got a supply of 1.1 million cubic meters every day," Zhang said.

Welding for the 2,400 kilometer western part of the project has been completed and the joints across the Yangtze and Yellow rivers have also been completed, encountering no problems that affect the schedule of the entire project, he noted.

"At the current progress, the whole pipeline can been put into test run by October this year and by December 31, natural gas will flow from the Tarim Basin in Xinjiang to Shanghai and Zhejiang Province," he said, adding that that means the project is completed one year ahead of schedule, a speed that has never attained in the history of pipeline laying in the world.

Zhang revealed that gas supply contracts have been signed with more than 20 major downstream gas users (one city is countered as one user), with a total amount reaching 6.957 billion cubic meters.

The design and building of the project have the participation of foreign experts and engineering personnel as well as supervisors. All the project was open to international competitive bidding.

"We encourage the China National Petroleum Corporation, the owner of the project, to keep in contact with foreign companies and negotiate on joint operation of the project," he said.

(Xinhua News Agency March 8, 2004)

Shanghai Gets Gas from Pipeline Project
Largest Gas Pipeline Project Ready for Trial Run
Key Section of West-east Gas Project Completed
East-West Gas Project on Track
Gas Pipeline Runs over 4,000 km Across China
West-East Gas Project
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 天天爽夜夜爽每晚高澡| 日本高清www无色夜在| 免费人成激情视频在线观看冫| 豪妇荡乳1一5白玉兰| 国产欧美日韩精品专区| 91精品国产高清久久久久久91 | 青青青青手机在线观看| 国产真实乱子伦精品| 91精品久久久久久久久久小网站| 女人洗澡一级毛片一级毛片| 中文国产在线观看| 日日操夜夜操免费视频| 久久精品福利视频| 机机对机机120分免费无遮挡 | 波多野结衣资源在线| 伊人亚洲综合网| 看黄网站在线看| 免费精品99久久国产综合精品| 老师的胸又大又软真好吃| 国产乱妇乱子在线播视频播放网站| 黑人巨茎大战俄罗斯美女| 国产片欧美片亚洲片久久综合| 自拍偷拍999| 国产精品自产拍高潮在线观看| 99re热这里只有精品| 大女小娟二女小妍| bt天堂在线www最新版资源在线| 小sao货求辱骂| 一区二区视频在线观看| 已婚同事11p| 一区在线免费观看| 好色先生tv网站| 一个人看的免费观看日本视频www 一个人看的免费视频www在线高清动漫 | 四虎成人永久地址| 色吊丝永久在线观看最新免费| 国产亚洲欧美在线| 野花日本免费观看高清电影8| 国产卡一卡二卡3卡4乱码| 青青青青啪视频在线观看| 国产亚洲欧美日韩俺去了| 蜜中蜜3在线观看视频|