--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

West-east Gas Pipeline to Be in Operation

A 3,900-kilometer-long natural gas pipeline that spans across the breadth of the country is scheduled for completion and commercial operation by the end of this year, according to Vice-Minister Zhang Guobao of the State Development and Reform Commission in Beijing Monday.

The mammoth project, which starts in the Tarim basin of the Xinjiang Uygur Autonomous Region in northwest China and ends in the east China coastal city of Shanghai, is part of the efforts of the country to make full utilization of the rich resources in the western part of the country and ease energy-hunger in the economically developed eastern part.

The eastern part of the pipeline, which refers to the 1,500 kilometers from Jingbian in northern Shaanxi to Shanghai, was completed by the end of last year and has begun to supply natural gas to Shanghai from January 1, 2004, Zhang told a press conference as sidelines of the annual session of China's top legislature.

During the icy cold winter, Shanghai got a supply of 1.1 million cubic meters every day," Zhang said.

Welding for the 2,400 kilometer western part of the project has been completed and the joints across the Yangtze and Yellow rivers have also been completed, encountering no problems that affect the schedule of the entire project, he noted.

"At the current progress, the whole pipeline can been put into test run by October this year and by December 31, natural gas will flow from the Tarim Basin in Xinjiang to Shanghai and Zhejiang Province," he said, adding that that means the project is completed one year ahead of schedule, a speed that has never attained in the history of pipeline laying in the world.

Zhang revealed that gas supply contracts have been signed with more than 20 major downstream gas users (one city is countered as one user), with a total amount reaching 6.957 billion cubic meters.

The design and building of the project have the participation of foreign experts and engineering personnel as well as supervisors. All the project was open to international competitive bidding.

"We encourage the China National Petroleum Corporation, the owner of the project, to keep in contact with foreign companies and negotiate on joint operation of the project," he said.

(Xinhua News Agency March 8, 2004)

Shanghai Gets Gas from Pipeline Project
Largest Gas Pipeline Project Ready for Trial Run
Key Section of West-east Gas Project Completed
East-West Gas Project on Track
Gas Pipeline Runs over 4,000 km Across China
West-East Gas Project
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 国产卡一卡二卡3卡4卡无卡视频 | 欧美伊久线香蕉线新在线| 免费无码av片在线观看| 色偷偷www8888| 国产又色又爽又黄刺激在线视频| ww亚洲ww在线观看国产| 国内精品久久久久久久影视| www.亚洲成在线| 我要看a级毛片| 久久久久无码国产精品不卡| 黄色一级一毛片| 国产精品成人四虎免费视频| 999影院成人在线影院| 女同学下面粉嫩又紧多水| 中国女人内谢69xxx| 无遮挡辣妞范1000部免费观看| 久久精品中文闷骚内射| 机机对机机120分免费无遮挡 | 欧美成人18性| 国产精品多p对白交换绿帽| 99re66热这里只有精品首页| 女人战争之肮脏的交易| 一级毛片免费播放试看60分钟 | 亚洲色无码国产精品网站可下载| 第272章推倒孕妇秦| 北条麻妃在线视频观看| 美国十次狠狠色综合av| 国产一区二区三区欧美| 被两个同桌绑起来玩乳动态gif| 国产国产在线播放你懂的| 人与禽交zozo| 国产欧美日韩视频在线观看| 1024手机看片基地| 国产精品99久久免费观看| 两个人看的视频高清在线www| 国产精品妇女一二三区| 3344免费播放观看视频 | 久久精品国产2020| 日韩夜夜高潮夜夜爽无码| 久久精品女人的天堂AV| 日韩国产免费一区二区三区|