--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Three Inquiries into South-North Water Diversion Project
Looking back into the past 50 hard years of the struggle harnessing the Yangtze, a giant South-North Water Diversion Project rises suddenly in view. A whimsical idea no more since the project is going to kick off with its East Route some days off this year.

How has the project's scale been determined? There are abundant water resources to be counted on, and such factors as minimum demand, potentials to be tapped and capabilities to bring pollution under control by the recipient areas. Things have all been looked into from a scientific approach beyond doubt, from various angles and in a planned way as a whole. According to scientists, China's north had suffered from a lack of 5.1 billion cubic meters of water in 2000, including 3.6 billion cubic meters of water extracted from underground, 1.5 billion cubic meters of water cut from agriculture and ecology. It is estimated that water shortages in China's recipient areas by 2010 would amount to 11.2 billion cubic meters and as many as 19.2 cubic meters by 2030.

The East Route as planned is going to be opened up in areas economically developed. But resultant pollution as a matter of public concern has to be seriously treated to ensure guaranteed supply of quality water, clean and unpolluted, and according to plans. It is reported that 369 projects are to be built with a total of 24 billion yuan (US$2.9 billion) to be allocated to build the East Route. It is told the first-phase project as has been planned is to use 14 billion yuan (US$1.69 billion) toward the goal of putting water supply through the whole trunk line of East Route in recipient areas to measure up to state's potable quality demands.

Water will be at a varied price level according to demands, supply amount and related costs involved as it runs through the recipient areas. Possible conveniences are to be provided as issuance of loans at a minimum interest rate and no burdens should be imposed weighing on the users.

As ruled on by the state, investments will be made on the basis of the lengths of watercourse to be built and water supply amounts provided. A cost outlet pricing system is to be instituted. By preliminary estimates, Shandong Province will have an outlet price averaging 0.60 yuan (US$0.07) per cubic meter of water from the trunk line of East Route. On the trunk line of central East Route north of the Yellow River an outlet price averaging 0.20 yuan (US$0.02) per cubic meter is estimated. Water supply to the north of the Yellow River will be at an average outlet price of 0.70 per cubic meter. Costs incurred as those of facilities and networks for water supply and putting pollution under control will also be included as a determining factor deciding on water pricing acceptable to recipients set by the state.

(People's Daily December 11, 2002)

State Approves Gargantuan Water Diversion Project
More Money to Fight Drought
China Ready for South-North Water Diversion Project
Project Could Wash away Relics
Ministry of Water Resources
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 精品国产精品国产| 黑人一个接一个上来糟蹋| 强行入侵粗暴h肉囚禁| 久久亚洲精品无码观看不卡| 欧美专区日韩专区| 亚洲精品短视频| 男的把j伸进女人p图片动态| 啦啦啦中文高清在线观看6| 韩国无码av片| 国产成人精品福利色多多| 你懂的视频在线播放| 国产高清小视频| av一本久道久久波多野结衣 | 韩国伦理s级在线| 国产欧美精品AAAAAA片| 又黄又骚的网站| 国产精品黄大片观看| 99久久精品这里只有精品| 女人让男人桶app免费大全| 三年片免费观看大全国语| 无套内射在线无码播放| 久久久久国产成人精品| 日本最新免费二区| 久久国产精品无码HDAV| 日韩精品黄肉动漫在线观看| 亚洲av永久综合在线观看尤物| 欧美成人免费全部| 亚洲欧洲无卡二区视頻| 欧美黑人乱大交| 亚洲第一成年免费网站| 永久黄色免费网站| 亚洲精品在线视频| 浪荡女天天不停挨cao日常视频| 人人添人人澡人人澡人人人爽| 男男gvh肉在线观看免费| 免费无遮挡无码视频网站| 知乎的小说哪里可以免费| 免费日本黄色网址| 男男18gay| 伊人影视在线观看日韩区| 狠狠综合视频精品播放|