Tools: Save | Print | E-mail | Most Read
China Mulling Construction of 2nd West-East Gas Pipeline
Adjust font size:

China is planning to build another natural gas pipeline from the energy-rich West to the energy-thirsty East in the coming five years from 2006 to 2010.

 

The proposal was raised in the draft of Guidelines for the Eleventh Five-Year Development Plan for National Economic and Social Development (2006-2010) submitted for examination and approval by the ongoing Fourth Session of the 10th National People's Congress (NPC).

 

Still in feasibility research stage, there is no timetable yet for its construction, said Li Runsheng, spokesman of the China National Petroleum Corporation (CNPC), China's largest natural gas producer.

 

Whether or when it will be constructed depends on supply and demand in China's natural gas market, he said.

 

The unbalanced distribution of natural gas resources is outstanding in the country, said Tang Yali, vice president of the Natural Gas and Pipeline Company under PetroChina.

 

East and Central China are experiencing rapid economic growth but also suffering shortage of energy.

 

Zhang Guobao, Vice Chairman of the National Development and Reform Commission (SDRC), said that China will increase its investment in the exploration of oil and gas resources of the Tarim Basin in Northwest China.

 

Huge gas reserves in China's West as well as increasing energy cooperation with the bordering countries make it feasible to build another west-to-east gas transmission pipeline, said Zhang.

 

An official with the CNPC said that the length, cost and the route of the new pipeline have not yet been decided.

 

But he said that the diameter of the second pipeline would be wider than that of the first west-east gas pipeline, which would demand much higher cost that the investment of 46 billion yuan (US$5.7 billion) for the first one, he said.

 

China plans to raise the ratio of natural gas in its total energy consumption to about 8 percent to 10 percent by 2010, instead of the existing 3 percent to 5 percent.

 

The first massive project to pipe natural gas from the west to the east was put into commercial operation at the end of 2004, starting from the Tarim Basin of Northwest China's Xinjiang and arriving in East China's Shanghai.

 

The pipeline extending 4,000 km traverses 10 provinces, autonomous regions and municipalities, with designed annual gas transmission capacity of 12 billion cubic meters, which can ensure a stable gas supply of 30 years.

 

(Xinhua News Agency March 11, 2006)

 

Tools: Save | Print | E-mail | Most Read

Related Stories
Oil Pipeline Projects in W. China to Be in Operation
Major Pipelines to Ease Energy Shortage in Five Years
Oil Pipeline in Guangdong Ready for Operation
Oil Pipeline Links China, Kazakhstan
Private Pipeline to Import Russian Oil
Gas Pipeline to Be Completed on Schedule

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號(hào)
主站蜘蛛池模板: 亚洲精品99久久久久中文字幕 | 男人让女人爽30分钟免费| 正在播放西川ゆい在线| 日本中文字幕在线精品| 在线日韩av永久免费观看| 国产区香蕉精品系列在线观看不卡| 伊人久久大香线蕉综合7| 久久精品免费一区二区| 99久久人人爽亚洲精品美女| 韩国中文字幕电影| 欧美视频免费在线播放| 手机在线观看视频你懂的| 国产精品中文字幕在线观看| 全免费a级毛片免费看| 久久精品久久精品久久精品| 99国产欧美另类久久久精品| 韩国美女主播免费的网站| 水蜜桃无码视频在线观看| 我与白丝同桌的故事h文| 国产日韩视频一区| 亚洲精品tv久久久久久久久久| 中文字幕在第10页线观看| 国产在线视频你懂的| 永久看一二三四线| 小次郎收藏最新地址| 国产女人嗷嗷叫| 亚洲国产精品成人综合久久久 | 又黄又骚的网站| 狠狠色狠狠色综合日日不卡| 搡女人真爽免费影院| 国产日韩欧美成人| 亚洲欧美日本a∨在线观看| 一区二区三区视频在线| 色橹橹欧美在线观看视频高清| 欧美伊香蕉久久综合类网站| 天堂avtt迅雷看看| 别揉我胸啊嗯~| 中日韩精品电影推荐网站| 国产精品亚洲自在线播放页码| 欧美特黄三级电影aaa免费| 女朋友韩国电影免费完整版|