China Proposes Construction of 2nd West-east Gas Pipeline

China is planning to build another natural gas pipeline from the energy-rich West to the energy-thirsty East in the coming five years from 2006 to 2010.

The proposal was raised in the draft of Guidelines for the 11th Five-year Development Guidelines for National Economic and Social Development (2006-2010) submitted for examination and approval by the ongoing Fourth Session of the 10th National People's Congress  (NPC).

Still in feasibility research stage, there is no timetable yet for its construction, said Li Runsheng, spokesman of the China National Petroleum Corporation (CNPC), China's largest natural gas producer.

Whether or when it will be constructed depends on supply and demand in China's natural gas market, he said.

The unbalanced distribution of natural gas resources is outstanding in the country, said Tang Yali, vice president of the Natural Gas and Pipeline Company under PetroChina.

East and central China are experiencing rapid economic growth but also suffering shortage of energy.

Zhang Guobao, Vice Chairman of the National Development and Reform Commission (NDRC), said that China will increase its investment in the exploration of oil and gas resources of the Tarim Basin in Northwest China.

Huge gas reserves in China's West as well as increasing energy cooperation with the bordering countries make it feasible to build another west-to-east gas transmission pipeline, said Zhang.

An official with the CNPC said that the length, cost and the route of the new pipeline have not yet been decided.

But he said that the diameter of the second pipeline would be wider than that of the first west-east gas pipeline, which would demand much higher cost that the investment of 46 billion yuan (US$5.7 billion) for the first one, he said.

China plans to raise the ratio of natural gas in its total energy consumption to about 8 percent to 10 percent by 2010, instead of the existing 3 percent to 5 percent.

The first massive project to pipe natural gas from the west to the east was put into commercial operation at the end of 2004, starting from the Tarim Basin of northwest China's Xinjiang and arriving in east China's Shanghai.

The pipeline extending 4,000 km traverses 10 provinces, autonomous regions and municipalities, with designed annual gas transmission capacity of 12 billion cubic meters, which can ensure a stable gas supply of 30 years.

(Xinhua News Agency March 11, 2006)


Print This Page E-mail This Page Return To Home

Copyright ? China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-88828000

主站蜘蛛池模板: 精品久久久久久久久午夜福利| 91av手机在线观看| 日本高清在线播放| 亚洲国产日韩欧美在线| 激情小说在线视频| 午夜两性色视频免费网站| 视频aavvmm国产野外| 国产欧美久久久精品影院| 67194线路1(点击进入)| 大陆三级特黄在线播放| 一本大道香蕉高清视频视频| 无敌小保子笔趣阁| 久久国产精品久久精品国产| 最近中文字幕完整电影| 亚洲国产成人99精品激情在线| 波多野结衣教师系列5| 免费日韩一级片| 约会只c不y什么意思| 国产v日韩v欧美v精品专区| 青青青青久久国产片免费精品| 国产成人精品久久| 日本www视频| 国产精品兄妹在线观看麻豆| 91精品欧美一区二区三区| 夜夜爽夜夜叫夜夜高潮漏水| www五月婷婷| 娇妻第一次被多p| 一级做a爰片久久毛片看看| 成年人免费视频软件| 久久99国产精品视频| 日本强不卡在线观看| 久久狠狠爱亚洲综合影院| 日韩精品无码一区二区三区AV | 久久久久久亚洲av成人无码国产 | 国产破外女出血视频| 你懂的国产高清在线播放视频| 国产精自产拍久久久久久| 91视频完整版高清| 国产黄大片在线观看| 91精品国产色综合久久| 国内不卡一二三四区|