Tools: Save | Print | E-mail | Most Read
Three Gorges Water Level Raised to 156 Meters
Adjust font size:

The second phase of raising the Three Gorges Reservoir's water level to 156 meters began at 10:00 PM on Wednesday, with the procedure aiming for completion by mid-October.

One of the 13 power-producing generators was shut down, reducing electricity generation to 5.65 million kw, down from 6.86 million kw, according to Li Yong'an, general manager of the China Yangtze River Three Gorges Project Development Corporation. By midnight, the water level in the Three Gorges Reservoir will have risen by 0.6 meters. The level is estimated to reach 156 meters in mid-October, which would be a milestone in the construction of the Three Gorges Project.

Earlier in the day, Chongqing municipality, upstream from the reservoir, launched a massive clean-up campaign to prevent water-fouling.

The timing of the second phase had been approved by the State Flood Control and Drought Relief Headquarters (SFCDRH), said Cao Guangjing, deputy general manager of the corporation.

SFCDRH has limited the raising of the water level to a maximum of five meters per day with the volume of water discharged downstream limited to 8,000-10,000 cubic meters per second so as to prevent affecting anti-drought efforts and water usage in downstream areas.

The second phase is one of the most important stages in the Three Gorges Project on the middle reaches of China's longest river, the Yangtze.

When the water level reaches 156 meters, the project will increase power production by 7.85 billion kw/hours annually, while water storage will rise by 11 billion cubic meters, improving shipping conditions upstream. The reservoir currently holds 14 billion cubic meters of water.

The water level will rise from the current 135 meters to 148 meters by October 1 and then to 156 meters by mid-October after a two-day break during which engineers can monitor the effects on the dam, which was completed in May. Traffic in the dam area has had to be restricted to one direction, alternating every 24 hours, since September 15 when work began on a year-long project to raise the beds of the two topmost tiers of the ship lock from 131 to 139 meters. This will ensure safe navigation when the water level behind the dam rises to 156 and finally to 175 meters.

The first rise from the natural flow of the Yangtze to 135 meters began on June 1, 2003, when the reservoir was formed. Meanwhile, Chongqing, the largest industrial city in the Three Gorges area, began a clean-up campaign with a budget of 4.6 million yuan (US$575,000). The areas of nine counties and districts in the municipality will be inundated when the water level rises to 156 meters.

Six hundred workers, with 208 boats and 58 motor vehicles, have been mobilized to clear the affected areas and the Yangtze's 20 dried-up lesser tributaries of tree branches, solid waste and farm debris, said Tang Jiali, deputy director of Chongqing Municipal Environmental Hygiene Bureau. "If this rubbish is not cleared, it will be washed down into the reservoir, polluting the environment and endangering shipping." 

About 1.16 million people have been relocated since construction on the project began in 1993. The 185-meter dam spans 2,309 meters, housing 26 power generators on banks, and a five-tier, dual-track ship lock.

The anticipated level of 156 meters resettled 244,500 people from 13 districts and counties at a cost of 10.27 billion yuan.

By April, 126 billion yuan (US$15.75 billion) had been spent on construction of the Three Gorges project. A total of 130 billion kw/h of electricity has been generated since July 2003, earning 25 billion yuan (US$3.125 billion) in revenue.

(Xinhua News Agency September 21, 2006)

Tools: Save | Print | E-mail | Most Read

Related Stories
One-way Traffic Only on Yangtze River near Three Gorges Dam
Three Gorges Project Authorized to Raise Water Level
Three Gorges Reef Explosion Project Approved
Three Gorges Quake Warning System to Be Set Up
Three Gorges Project 'Not to Blame' for Severe Drought
Three Gorges Reservoir to Hold More Water
Three Gorges Dam - Breaking Walls and Records
Three Gorges Cofferdam Demolished
Three Gorges Dam Completed
Last Leg of Work on Main Three Gorges Dam Wall
Checks on Bank of Dam Project
Three Gorges Reservoir's Water Level to Be Raised
Dam Project to Be Completed This Month

Product Directory
China Search
Country Search
Hot Buys
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號
主站蜘蛛池模板: 无码一区18禁3D| 精品视频一区二区三三区四区 | 日本护士取精视频xxxxx全部| 亚洲视频一区在线播放| 高清欧美性猛交xxxx黑人猛交| 特黄AAAAAAAAA毛片免费视频| 国产成人久久综合热| caopon国产在线视频| 明星ai人脸替换造梦在线播放| 偷自拍亚洲视频在线观看99| 香瓜七兄弟第二季| 国内精品久久久人妻中文字幕| 中文字幕免费人成乱码中国| 欧美三级免费看| 免费播放在线日本感人片| 黄色a视频在线观看| 日产乱码免费一卡二卡在线| 免费观看成人毛片| 91精品免费高清在线| 无码精品一区二区三区免费视频 | 在车子颠簸中进了老师的身体| 久久久精品中文字幕麻豆发布| 欧美最猛黑人xxxx黑人猛交98| 国产成人无码18禁午夜福利P| 久久aⅴ免费观看| 欧美成人全部费免网站| 全球全球gogo专业摄影| 麻豆精品久久久久久久99蜜桃| 国产高清自拍视频| 久久综合精品视频| 精品日韩二区三区精品视频| 国产福利在线观看视频| 中文字幕无线码一区二区| 欧美专区在线视频| 人妻少妇偷人精品视频| 五月激情综合网| 在线观看精品视频网站www| 中文字幕手机在线播放| 最好看的免费观看视频| 亚洲熟妇无码AV不卡在线播放| 精品熟人妻一区二区三区四区不卡|