--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies


32 Power Plants Ordered to Stop Construction

On July 15, four state bodies jointly ordered a halt to the construction of 32 power stations, 10 and 11 of which are in Henan Province and Inner Mongolia Autonomous Region respectively, because they do not meet environmental and other national standards.

 

The National Development and Reform Commission (NDRC), the State Environmental Protection Administration and the ministries of land and resources and water resources announced that problems with the plants included illegally drawing groundwater.

 

The NDRC said these projects breached rules and regulations concerning land requisition, environmental protection, and water and soil preservation, so could not be included in the country’s short-term power development planning.

 

With a total planned capacity of 17.114 million kilowatts, the power stations required investment of 85.5 billion yuan (US$10.5 billion), with 20 billion yuan (US$2.46 billion) already spent.

 

“Letting their construction continue would not only adversely affect the development of the power industry, but would also bring about risks to the financial sector, influencing sustainable economic development,” said an NDRC official.

 

In February, the General Office of the State Council called on government departments to put a stop to the building of illegal power stations, saying that they would “disturb implementation of the state’s overall energy strategy, causing chaotic power construction and contradictions between coal supply and limited transportation capacity.”

 

At that time, according to the NDRC, illegal power station projects had a total capacity of 125 million kilowatts. They had no approval for their feasibility reports, had not applied for examination or approval, or had not suspended construction after being instructed to previously.

 

The NDRC said all the stations should stop construction and planning immediately and local departments take up their responsibilities in dealing with any remaining problems.

 

Power plant projects have become attractive to many localities as a source of inward investment. Along with an increase in demand for electricity, this has encouraged their construction even when regulations have not been met.

 

(China Business News translated by Zhang Tingting for China.org.cn, July 28, 2005)

Chinese Scientists Upgrade First Experimental Wave Power Station
East China Farmers Say Power Plant Will Pollute Villages
Power Plant Needs Generate Business
SEPA Fines Power Station Projects
First Wave Power Station on the Way?
Top Ten Investment Projects in 2004
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 陪读妇乱子伦小说| 99精品人妻少妇一区二区| 日韩精品武藤兰视频在线| 亚洲欧美另类自拍| 男人精品网站一区二区三区| 四虎国产精品免费久久久| 黄色一级毛片看一级毛片| 国产精品多p对白交换绿帽| 99精品热这里只有精品| 尾野真知子番号| 国产AV日韩A∨亚洲AV电影| 91影院在线观看| 国产精品久久福利网站| 91麻豆国产在线观看| 大香网伊人久久综合观看| yin荡护士揉捏乱p办公室视频| 欧美一级在线观看| 亚洲短视频在线观看| 狠狠色综合网站久久久久久久高清| 午夜伦4480yy私人影院| 老色鬼久久亚洲av综合| 国产乱弄免费视频| 香蕉97超级碰碰碰碰碰久| 国产成人综合久久精品| aa级国产女人毛片水真多| 国产精品无码免费视频二三区| 97日日碰曰曰摸日日澡| 在线观看成年人| a级毛片在线免费观看| 女人十八进入一及黄特别片| 一本到在线观看视频| 性高朝久久久久久久3小时| 中文字幕一区二区精品区| 拨开内裤直接进入| 丰满老熟妇好大bbbbb| 日日夜夜综合网| 久久99精品久久久久久hb无码| 日本免费网站观看| 久久久午夜精品福利内容| 日本成人在线视频网站| 久久免费看黄a级毛片|