--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies


Olympic Officials: No Change in Beijing's Plans

Beijing Olympic organizers pledged Thursday that suspended building work on projects for the 2008 Games would soon be resumed.

 

"We are not making any big changes to the original plan," said Liu Jingmin, vice mayor of Beijing and the executive president of the Beijing Organizing Committee for the Games of XXIX Olympiad (BOCOG), during the committee's first press conference in the host city of the 2004 Games.

 

"It's some minor changes due to the economic and feasibility evaluations we are doing right now."

The construction of a couple of main venues for the 2008 Games including the National Stadium which will host the opening, closing ceremonies and football finals, has halted, raising nationwide speculation that the original designs for the venues are too much for the organizers to handle.

 

The stadium dubbed the "Bird’s Nest" for its nest-like outlook, is jointly designed by Swiss company Herzog and de Meuron Architects and the China Design and Architecture Institute. But construction experts claim that the plan will be difficult to realize and is expected to consume a massive 50,000 tons of iron and steel.

 

Another stadium, the Wukesong Cultural and Sports Center, which will host the Olympics basketball competition, also drew criticism from the experts who claimed what will be the world's biggest television screen, which will cover the entire surface of the stadium, would cause light pollution and make it hard for surrounding residents to sleep at night.

 

"The change will not influence the planned function or the outlook of the venues," Liu said.

 

Liu said the venue construction project has entered the phase of budget evaluations and feasibility studies and it is inevitable for every Olympic organizer to make slight changes to the original designs.

 

"There is a batch of experts working with us to do the evaluation. We will announce the outcome soon," he said.

 

Liu cited the idea of hosting a "prudent" games was the main reason for the changes. "We had promised during the bidding phase that we will have a prudent games and we are working for this.

 

"The evaluation of venue construction is one of the way in which we can be prudent," he said. He is giving out three criteria to make changes.

 

"First we would like to know if we can better use the existing resources. Then we need to find out if the design is up to the standard for hosting the Olympic Games and whether the venues are able to be better used after the games."

 

Beijing is about to invest US$1.6 to US$2 billions on venue constructions, including 37 for competitions and 59 for training.

 

Liu said there is no change to the budget with the changes but stressed that the idea of being prudent will be one of the guidelines in the future.

 

"What we need are some down-to-earth preparations rather than luxurious expenses," he said.

 

Liu also revealed that the construction of the venues will be finished in 2007, rather than 2006, which was originally promised in the city's bid, which has also been the suggestion of the International Olympic Committee (IOC) Co-ordination Commission during the IOC's 116th session here.

 

Up to now, seven of the 18 new venues are under construction and the designs for most of the other venues have been collected through international bids.

(China Daily August 13, 2004)

Bird's Nest in the Soup
Four Great Buildings to Shape Olympic Beijing
Ground Broken for Olympic Venues
Consortium Wins Bid for National Stadium
Design Chosen for Swimming Center
'Bird's Nest' Raises Expectation for Innovative Schemes
Architecture Design for 2008 Olympic Main Stadium Picked
Construction of 2008 Main Stadium to Start in December
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 国产粗话肉麻对白在线播放| 强开小婷嫩苞又嫩又紧视频韩国| 国产精品永久久久久久久久久| 久久婷婷五月综合97色一本一本| 精品亚洲国产成人| 国产免费一区二区三区免费视频 | 国产亚洲蜜芽精品久久| 日本网址在线观看| 国产精品无码无在线观看| 99热在线精品播放| 女人是男人的未来1分29分| 中国一级毛片免费看视频| 欧美亚洲第一区| 初女破苞国语在线观看免费| 色哟哟在线网站| 国产免费资源高清小视频在线观看| 欧美性狂猛bbbbbxxxxx| 国产精品亚洲αv天堂2021| 一级一级女人18毛片| 旧里番洗濯屋1一2集无删减| 免费a级毛片无码a∨性按摩| 精品日产卡一卡乱码| 国产a三级久久精品| 视频一区二区三区免费观看| 国产在线观看午夜不卡| 91手机在线视频观看| 国产成年无码久久久免费| 99热精品久久只有精品| 太大了轻点丝袜阿受不了| yellow视频免费看| 日产精品卡二卡三卡四卡乱码视频| 久久精品国产亚洲精品2020| 最新精品国偷自产在线| 亚洲av综合av一区| 校花小冉黑人系列小说| 亚洲va韩国va欧美va| 果冻传媒高清完整版在线观看 | 国产精品日韩欧美一区二区| 538在线视频| 国产精品视频李雅| 69老湿机体验区手机|