--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies


Olympic Officials: No Change in Beijing's Plans

Beijing Olympic organizers pledged Thursday that suspended building work on projects for the 2008 Games would soon be resumed.

 

"We are not making any big changes to the original plan," said Liu Jingmin, vice mayor of Beijing and the executive president of the Beijing Organizing Committee for the Games of XXIX Olympiad (BOCOG), during the committee's first press conference in the host city of the 2004 Games.

 

"It's some minor changes due to the economic and feasibility evaluations we are doing right now."

The construction of a couple of main venues for the 2008 Games including the National Stadium which will host the opening, closing ceremonies and football finals, has halted, raising nationwide speculation that the original designs for the venues are too much for the organizers to handle.

 

The stadium dubbed the "Bird’s Nest" for its nest-like outlook, is jointly designed by Swiss company Herzog and de Meuron Architects and the China Design and Architecture Institute. But construction experts claim that the plan will be difficult to realize and is expected to consume a massive 50,000 tons of iron and steel.

 

Another stadium, the Wukesong Cultural and Sports Center, which will host the Olympics basketball competition, also drew criticism from the experts who claimed what will be the world's biggest television screen, which will cover the entire surface of the stadium, would cause light pollution and make it hard for surrounding residents to sleep at night.

 

"The change will not influence the planned function or the outlook of the venues," Liu said.

 

Liu said the venue construction project has entered the phase of budget evaluations and feasibility studies and it is inevitable for every Olympic organizer to make slight changes to the original designs.

 

"There is a batch of experts working with us to do the evaluation. We will announce the outcome soon," he said.

 

Liu cited the idea of hosting a "prudent" games was the main reason for the changes. "We had promised during the bidding phase that we will have a prudent games and we are working for this.

 

"The evaluation of venue construction is one of the way in which we can be prudent," he said. He is giving out three criteria to make changes.

 

"First we would like to know if we can better use the existing resources. Then we need to find out if the design is up to the standard for hosting the Olympic Games and whether the venues are able to be better used after the games."

 

Beijing is about to invest US$1.6 to US$2 billions on venue constructions, including 37 for competitions and 59 for training.

 

Liu said there is no change to the budget with the changes but stressed that the idea of being prudent will be one of the guidelines in the future.

 

"What we need are some down-to-earth preparations rather than luxurious expenses," he said.

 

Liu also revealed that the construction of the venues will be finished in 2007, rather than 2006, which was originally promised in the city's bid, which has also been the suggestion of the International Olympic Committee (IOC) Co-ordination Commission during the IOC's 116th session here.

 

Up to now, seven of the 18 new venues are under construction and the designs for most of the other venues have been collected through international bids.

(China Daily August 13, 2004)

Bird's Nest in the Soup
Four Great Buildings to Shape Olympic Beijing
Ground Broken for Olympic Venues
Consortium Wins Bid for National Stadium
Design Chosen for Swimming Center
'Bird's Nest' Raises Expectation for Innovative Schemes
Architecture Design for 2008 Olympic Main Stadium Picked
Construction of 2008 Main Stadium to Start in December
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 亚洲AV无码精品国产成人| 美女张开腿让男人桶爽国产| 在线观看你懂得| 被滋润的艳妇疯狂呻吟白洁老七| 精品少妇一区二区三区视频| 狠狠噜狠狠狠狠丁香五月| 欧欧美18videosex性哦欧美美| 日本三区四区免费高清不卡| 宝宝看着我是怎么进去的视频| 国模无码一区二区三区不卡| 夜色资源站www国产在线观看| 国产麻豆videoxxxx实拍| 国产精品亚洲精品日韩已满 | 欧美另类videosgratis妇| 法国女人与动zozoz0z0| 欧美乱人伦中文字幕在线不卡| 日韩福利在线视频| 日本三级片网站| 天天拍天天干天天操| 国产精品亚洲二区在线| 国产区图片区小说区亚洲区| 北条麻妃vs黑人解禁| 亚洲精品国产综合久久久久紧| 亚洲一级在线观看| 久久久www成人免费精品| sao浪美人的激爱之路| 亚洲成a人片在线观看精品| 色综合色综合久久综合频道| 永久免费毛片在线播放| 最近韩国电影高清免费观看中文| 手机国产乱子伦精品视频| 国产精品三级在线观看无码| 免费福利小视频| 亚洲日韩亚洲另类激情文学| 久久亚洲免费视频| a级特黄的片子| 人人洗澡人人洗澡人人| 翁熄止痒婉艳隔壁老李头| 欧美日韩国产高清一区二区三区 | 国产探花在线视频| 激情小说亚洲色图|