--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies


Global Warming Troubles Qinghai-Tibet Railway Construction
Global warming may prove to be another problem for designers and builders of the Qinghai-Tibet Railway under construction in northwest China.

Already racking their brains for a solution to building the world's highest railway on the permafrost earth, scientists are finding it much harder than expected to find solutions to construction problems exacerbated by the warming climate.

Many scientists and research institutions were working hard to minimize the impact of global warming on the Qinghai-Tibet Railway,said Lu Chunfang, leader of the construction project.

The frozen earth of the Qinghai-Tibet Plateau was degenerating because of global warming and the increase in human activities in the region, according to recent research.

Research produced by the Chinese Academy of Sciences indicated that the perennial frozen earth on the plateau is now five to seven meters thinner than 20 years ago, while about 10 percent of the plateau's frozen earth had vanished.

Meteorological statistics show the annual average temperature on the Qinghai-Tibet plateau has gone up 0.2 - 0.4 degrees Celsiusfrom the 1970s to the 1990s.

Scientists said the climate changes had impacted on the ground temperature to a depth of 40 meters, with greater changes in layers to a depth of 20 meters.

Global warming had accelerated the erosion of the frozen earth, exerting great pressure on the construction of the Qinghai-Tibet Railway and its future operation.

Scientists said the success of the construction, and maintenance of the railway, would be dependent on finding ways to stabilize the gradually thawing earth.

The permafrost layer thickens as the temperature drops and thins when temperatures increase, reducing the stability of the railway foundation.

Scientists warned that fluctuations in stability caused by changes in the thickness of the permafrost layer could create future hazards if the problem was not resolved.

"We have taken the impact of global warming into consideration when plotting the route of the railway," said Lu Chunfang.

When scientists began designing the railway, they predicted the temperature on the Qinghai-Tibet Railway would rise only 1 degree Celsius in the next 50 years.

But other scientists have estimated that the plateau temperature may rise by 2.2 - 2.6 degrees Celsius in the next 50 years, bringing greater pressure to bear on the design and construction of the railway.

Construction bosses have adopted three special measures to ensure the stability of the roadbed in the permafrost areas, including changing routes, building railway bridges along sections of complex geological conditions, and building soil layers that can insulate the ground from heat created by the railway.

About 550-km section of the railway will traverse perennially frozen areas, the longest stretch of its kind in the world.

The 1,956-km Qinghai-Tibet railway will run from Xining,the capital of northwest China's Qinghai Province, to Lhasa, the capital of Tibet Autonomous Region.

The section linking Xining and Golmud City in Qinghai was completed in 1984. Construction of the 1,118-km section connecting Golmud with Lhasa began in June 2001 and is expected to be completed by 2007.

The construction plan calls for a total investment of 16 billion yuan (US$1.9 billion) for the 554-km permafrost section of the railway.

(Xinhua News Agnecy April 30, 2003)


Global Warming to Reduce Glaciers, Frozen Soil, Snow in China
Global Warming Does Not Intensify Tropical Cyclones
Global Warming Affects China's Water Security
Global Warming Gives Rise to Global Warnings
Global Warming Brings More Weather, Climate Extremes
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
主站蜘蛛池模板: 亚洲精品欧美精品中文字幕| 国产在线精品一区二区不卡| 一区二区三区四区精品| 日本牲交大片免费观看| 亚洲一区欧洲一区| 欧美色欧美亚洲高清在线观看| 内射干少妇亚洲69xxx| 胸奶好大好紧好湿好爽| 国产免费黄色大片| 成年美女黄网站色| 国产精品bbwbbwbbw| 37大但人文艺术a级| 国内精品第一页| a级毛片免费高清视频| 小蝌蚪app在线观看| 中文字幕avdvd| 色综合久久久无码中文字幕波多| 国产欧美第一页| 伊人一伊人色综合网| 国内精品久久久久影视| av免费不卡国产观看| 女人18毛片a级毛片免费| 一本久久A久久免费精品不卡| 成人浮力影院免费看| 中文字幕无线码免费人妻| 日本乱人伦中文在线播放| 久久人人爽爽爽人久久久| 旧里番6080在线观看| 亚欧色视频在线观看免费| 欧美亚洲视频在线观看| 亚洲国产精品热久久| 欧美日韩一区二区三区在线观看视频| 亚洲精品一二区| 毛片男人18女人19| 亚洲欧美色一区二区三区| 污污的软件下载| 亚洲第一页视频| 欧美高清国产在线观看| 亚洲特级黄色片| 欧美日韩综合视频| 亚洲国产精品福利片在线观看|