Home / China / Local News Tools: Save | Print | E-mail | Most Read | Comment
Safety first in metro's hall upgrade
Adjust font size:

Workers dismantle ticket reading machines late yesterday at the entrance to the People's Square Station of Metro Line 2 to make way for a new route to pass the underground hall and ease passenger flow.

Shanghai metro passengers interchanging between Lines 1, 2 and 8 at the People's Square Station should follow a new route to pass the underground hall, under changes to improve traffic there.

The program to ease clogging of passenger flows underground was scheduled to start after metro operation ended last night.

Temporary guiding equipment has been set up to steer passengers to exits or the interchange until relocation work?is completed.

Under the program, seven stores in the northern hall near Line 2 are to be removed to provide space for passengers.

The number and locations of ticketing machines for Line 2 have also been adjusted.

All efforts have been made to separate passengers changing for Line 2 after getting off Lines 1 and 8 from others on the opposite route.

The current hall of the People's Square Station was put into use last year, together with the city's new Lines including Line 8. The new hall, also named the People's Square Station's "giant triangle," not only enables passengers to change among three lines but also greatly cuts down the previous long interchange walking distance between Lines 1 and 2.

Local commuters had complained about the long, old passage for years.

However, with the number of passengers interchanging in the new hall reaching more than 250,000 daily, metro operators have found overcrowding in some areas of the hall an alarming safety issue that needed changing.

Passengers leaving Lines 1 and 8 for Line 2 and others coming from the opposite direction were confronting each other and causing major overcrowding during rush hours as they all tend to pass through the two arches closest to the platforms.

This safety concern has caused metro operators to streamline the big crowds by improving layout of the hall.

The city metro turnover hit a new record high of 3.23 million people on Friday, the first day following the Lantern Festival.

The interchange traffic flow on Friday also reached a new peak of 978,000 people, said the metro authority.

The total mileage of local metro systems jumped to 234 kilometers last year with the opening of three new lines and two extended reaches.

On the still expanding network, there are now eight lines in service with 161 stations.

The number of daily passengers on each of the new lines is increasing at a rapid speed.

The metro authority dispatched 30,000 extra tickets on the lines and added 48 train shuttles on Friday to handle the traffic peak after Spring Festival.

(Shanghai Daily February 25, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
Most Viewed >>
- 17 jailed for mine blast claiming 105 lives
- Bird flu suspect dies in Guangdong
- Moving train cuts off baby girl's legs
- Probe shifts to restaurant in Shenzhen food poisoning case
- China to launch Chang'e-2 around 2009
- 17 sentenced for coal mine blast
- Homemade chip to serve China's navigation system
- Snow to hit east, west, central China
- 10 missing after boat sank in E. China Sea
- Venue for Chanel's 'Mobile Art' exhibition built in HK
主站蜘蛛池模板: 国产精品十八禁在线观看| 男人添女人下部全视频| 天天操天天干天天干| 乱码一乱码二乱码三新区| 精品午夜久久福利大片免费| 国产午夜无码片在线观看影院 | 中文字幕精品视频在线观| 洗澡与老太风流69小说| 国产亚洲欧美精品久久久| 99re在线视频观看| 无翼乌邪恶帝日本全彩网站| 亚洲成a人片在线看| 男人桶女人的肌肌30分| 北条麻妃vs黑人解禁| 国产喷水女王在线播放| 天天视频官网天天视频在线| 中文字幕日韩高清| 日本性生活网站| 亚洲成人福利在线观看| 精品无码久久久久久久动漫| 在电影院嗯啊挺进去了啊视频| 一本一本久久a久久精品综合麻豆| 欧美αv日韩αv另类综合| 免费国内精品久久久久影院| 视频在线观看国产| 国产精品无码久久久久| 91麻豆高清国产在线播放| 天天干天天干天天干天天干天天干 | 亚洲国产成人精品电影| 精品久久久中文字幕二区| 国产午夜精品一区二区三区| 欧美欧洲性色老头老妇| 国产精品久久久久久搜索| 天堂资源中文在线| 天天干天天天天| www.henhenai| 无码任你躁久久久久久久| 久久久久亚洲av无码专区| 樱花草www日本在线观看| 亚洲精品影院久久久久久| 精品福利一区二区三区免费视频|