Home / News Type Content Tools: Save | Print | E-mail | Most Read | Comment
Hydropower Development Plan Set for Lancang River
Adjust font size:

Sources from the annual conference of Hydropower Construction Management Professional Committee under the China Hydropower Engineering Association said China has set the initial hydropower development plan for the Lancang River reaches. By 2020 the Lancang River reach will produce a total of 22 million KW installed capacity.

 

According to the plan, 15 step power stations with a total installed capacity of 25.605 million KW will be built in the Lancang River reaches. Eight step hydroelectric power stations with 9.4 million KW installed capacity and 46 billion KWH annual output will be set up in the upper reaches. Another 7 step power stations with 16.005 million KW installed capacity and 73.7 billion KWH annual output will be built in the middle and lower reaches.

 

Step power stations in the Lancang River reaches have been listed as key bases to activate the “West-to-East” electricity transfer strategy. Relevant authorities started the overall development of the Lancang River reaches from the accomplished Manwan Hydropower Station some years ago.

 

Now, the first phase of Manwan Hydropower Station and Dazhao Mountain Hydropower Station construction has finished. The Xiaowan Hydropower Station with an installed capacity of 4.2 million KW is currently under construction. It’s supposed that the first power-generating unit will be deployed by 2010 and construction finally finished by 2012.

 

Experts pinpoint that overall development confronts many difficulties such as insufficient capital input for packaged projects, over-rapid expenses for restoring forest vegetation and lowered power pricing for the Manwan station. All these difficulties have affected the construction process to some extent. The Lancang River originates in southern Qinghai Province, where its highest tributaries wind down the valleys of the Tanggula Mountains. It enters Tibet Autonomous Region and Yunnan Province and flows out of China from Mengla County of the Xishuangbanna Autonomous Prefecture. The section out of China, called Mekong River, empties into the South China Sea near Hoh Chi Minh City in Vietnam after making its way through Laos, Myanmar, Thailand and Cambodia.

 

(China.org.cn by Alex Xu and Daragh Moller, December 15, 2003)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- China Opens Major Port on Lancang River
- Yunnan Active in Lancang-Mekong River Region Cooperation
- Millions Invested to Monitor International Rivers
- China to Launch Dredging Project on Lancang River
- Multinational Greater Mekong Program Gears up
- Hydraulic Works on Lancang River not Detrimental to Mekong Ecology: Official
- Xiaowan Dam, A Reservoir for Progress
- New Power Generating Unit in Operation on Lancang River
Most Viewed >>
- World's longest sea-spanning bridge to open
- Yao out for season with stress fracture in left foot
- 141 seriously polluting products blacklisted
- China starts excavation for world's first 3G nuclear plant
- 'The China Riddle'
- Irresponsible remarks on Hu Jia case opposed 
- China, US agree to step up constructive,cooperative relations
- Factory fire kills 15, injures 3 in Shenzhen
- FIT World Congress: translators on track
- Christianity popular in Tang Dynasty

Product Directory
China Search
Country Search
Hot Buys
主站蜘蛛池模板: 香蕉伊思人在线精品| 免费无码专区毛片高潮喷水| 6080一级毛片| 妞干网在线视频观看| 丰满老熟好大bbb| 日韩在线播放全免费| 亚洲人成网站在线观看青青| 波多野结衣在线观看一区二区三区| 动漫人物桶动漫人物免费观看 | 亚洲欧美4444kkkk| 特级av毛片免费观看| 免费黄色一级电影| 美国式禁忌矿桥矿网第11集| 国产亚洲精品欧洲在线观看| а√在线地址最新版| 无人视频在线观看免费播放影院| 久久精品国产精品亚洲蜜月| 欧洲肉欲K8播放毛片| 亚洲成AV人综合在线观看| 深夜的贵妇无删减版在线播放| 免费在线观看的黄色网址| 精品少妇一区二区三区视频| 国产**aa全黄毛片| 蜜柚直播在线第一页| 国产嘿嘿嘿视频在线观看| 99久久国产综合精品五月天| 国产精品99久久久久久董美香| 4444在线观看片| 国产视频一二三区| 91高清免费国产自产| 在线视频一区二区日韩国产| www久久只有这里有精品| 小泽玛利亚国产在线视频| 一道本视频在线观看| 成人免费看www网址入口| 中文字幕精品一区二区精品| 日日夜夜天天操| 久久er99热精品一区二区| 日本三级韩国三级三级a级按摩 | 久久青青成人亚洲精品| 柔佳呻吟乳峰喘息高耸入云|